Instaspace provided a solution for Sacred Heart School

 Sacred Heart School  

What We Did

Instaspace Modular was contracted to manufacture and install a fully functioning teaching facility, to house seven resource rooms, toilets - including two disability toilets and an administration office for Sacred Heart Boys’ National School, Dublin.

We constructed the modular, pre-fabricated units off-site and craned them into position to create a 240m2 Plastisol steel exterior finished building.

Our work included securing existing site, demolishing existing derelict building and disposing of materials off site. Once cleared, the site was drained, in preparation for installation of the new build.

All works, from site preparation through to finish were carried out to the highest standard, in accordance with current building regulations.

Instapace - Sacred Heart School
Instapace - Sacred Heart School

Key Points

  • Because of the extremely busy ‘active’ school environment, we craned-in and installed the new building overnight, enabling work to proceed with minimum disruption
  • All works were completed, within the designated 6 week time frame
  • A total fit-out was conducted in accordance with client specification, which included total mechanical and electrical installation, high quality decoration and internal floor coverings
  • Instaspace Modular provided and installed two entrance landings and ramps, complete with all tactile warnings and associated handrails
  • We also delivered on commissioning, testing, certification and compliance with current TDG’s      

    