Instaspace provided a solution for St James' Hospital, Dublin 8

St James' Hospital, Dublin 8

What We Did

Instaspace Modular was contracted to build a single storey, CPL Building with a work station room, printer room and canteen area. The 144m2 galvanised steel, modular, pre-fab, was also linked to the existing St. Jame’s Hospital Building.

To complete the project, Instaspace carried out all specified works, from site preparation to interior and exterior finish, in compliance with current building regulations.

We prepared and drained the site. The prefabricated units were manufactured off-site, transported, craned-in and installed on site.

Instapace - St James' Hospital, Dublin 8
Instapace - St James' Hospital, Dublin 8

Key Points

  • Instaspace Modular finished and handed over the total turn-key package within a 2.5 week time frame
  • We provided floor covering and interior finish to suit St. Jame’s Hospital specific needs
  • The total mechanical and electrical fit-out was carried out in accordance with client specification
  • Instaspace Modular also delivered on commissioning, testing and certification
  • External work was completed by making good any disturbed ground